Published February 2019

Analysis of oil-gas production state in the context of “Balakhany Operating Company LTD”

S.V. Mammadly

S.Ch. Bayramova

A.A. Nasibova

F.G. Hasanov

Keywords:  
oil-gas production
mechanical impurities
deep-well pump
Ramany lake
Ramany tunnel
Hovsan channel
dynamic level
produced water
oil-gas-water separator
injection wells
environment
pump shop

With the purpose of environment protection and oil production increase as well, the construction of pressure-sealed centralized gathering point (CGP) in the shops of oil-gas producing enterprises and the elimination of constructed apart oil-gas-water separators in various field sites are required. Produced water gathered into the CGP tanks after the refining from petrol suspended solids, mechanical impurities and salt sediments should be pumped into the injection well to be forwarded in the direction of producing well of oil remained at rest within formation, and the oil should be delivered to the centralized oil gathering control point. The territories polluted with oil and produced water should be refined and provided with facilities.

Links