Reconstruction of oil-gas production system in OGPD named after N. Narimanov and the measures against paraffin deposit
S.Ch. BayramovaFor the purpose of environment protection, as well as the improvement of working conditions, increase of oil production and cost reduction on the construction-design works in oil-gas producing shops of OGPD named after N.Narimanov, it is necessary to liquidate the piers in the critical condition, to conduct the overhaul repair of the oil well site and renew electric power lines. The pressure gas injected into the well as a reagent should be heated to the 80–100 оС, it is also necessary to automatize all technological processes on the sites and provide control on them via wireless communication.