Published November 2020, Pg. 26-29
Section: Well drilling
UOT: 622.276.24
DOI: 10.37474/0365-8554/2020-11-26-29
On specification of relaxation time for subsurface rocks composing borehole walls in geothermal well drilling
T.Sh. Salavatov Dr. in Tech. Sc. - Azerbaijan State University of Oil and IndustryThe paper makes an effort to specify the relaxation time of subsurface rocks composing the borehole wall during geothermal well drilling justifying theoretical and practical researches. To solve mentioned issues, a theory of dumping of pressure fluctuations in non-stationary motion of drilling mud in the circulation system of well, based on the data of change of pressure and time consumption is applied and as a result a calculation formula obtained.
The method has been tested in the well No 245 in Muradkhanly area.
References:
1. Baydyuk B.V., Shreyner L.A. Raschyot ustoychivosti gornykh porod v skvazhinakh: sb. voprosov deformatsii i razrusheniya gornykh porod pri burenii. – M.: GOSINTI, 1971, 126 s.
2. Gasanov G.T., Makhmudov R.N., Safarov Ya.I. Opredelenie mekhanicheskikh svoistv gornykh porod na osnove ust´yevykh informatsiy // Neft´ i gaz, 1974, No 2, s. 23-29.
3. Safarov Y.I., Ismayilov Sh.I. Murekkeb sheraitde neft ve gaz guyularynyn gazilmasy tekhnologiyasynyn tekmilleshdirilmesi. – Baki: SEDA, 2001, 183 s.
4. www.dissertant 05.2010
5. www. ngnedra.ru