Perspectives of Palchig Pilpilasy field further development
D.F. HuseynovaOn the basis of recalculated oil and gas reserves of Palchig Pilpilasy field by 01.01. 2008, further development project has been composed in three variants. In all three variants the forecast technological indexes are given. According to the first variant 35 returning-testing works in the wells keeping current system of 135 producing wells have been foreseen. This variant has been accepted as basic one in comparison with other development alternatives. In the second variant for total and efficient production of remaining recoverable oil reserves, two basic variants - Sabunchy Suite-4 and Gala Suite-3 have been selected and drilling of new 30 producing well on them is planned (drilling rate of new producing wells in a year within 2011-2017). 115 returning works from the basic objects on the mentioned above ones, where there are remaining recoverable oil reserves are planned. According to the third variant the well quantity on basic object is the same as in the second variant, the difference is only in drilling rate (7 wells in a year within 2011-2015). After the analysis of development technological indexes calculation results from the technical-economical point of view, for the Palchig Pilpilasy field efficient further development providing the third variant has been selected.