Published July 2013

The electrochemical protection measuring device of hydrotechnical constructions potential for high input resistance providing

R.B. Dadashovа

F.I. Mammadov

A.Y.Shirinova

In the article the issues of investigation and development of high input resistance providing on offshore constructions protection measuring are reviewed. With this purpose as an element of comparison the sensor that is connected to the input of two-emittered repeating amplifier is installed. The theoretical investigations were carried out on the basis of transistor equivalent circuit. The operation characteristics with 1% error was defined.

Links